Refrigeration | Air conditioning | Catering Equipment
Covid Safe
Slider

Coffs Harbour Justice Precinct Project

The buildings have been designed & engineered to be economical to build operate & maintain but has the requisite to quality for image and function and provide adequate level of adaptability for future changes & expansion.

Key design element objectives have also been placed on Passive & Active Energy efficiency, environmental policies including reduced waste energy & Co2 emissions. Estimated build cost for the project is $73M with the Principal being NSW Dept of Attorney General And Justice.

Faircloth & Reynolds have been awarded the Mechanical component of the project with Richard Crookes as the Building contractor.

Key components Faircloth & Reynolds are providing on this contract

  • Engineering
  • Drafting
  • Duct manufacture
  • Duct installation
  • Electrical Engineering
  • BMS installation Mechanical services
  • Project management Mechanical services
  • Chilled Water pipework installation
  • Chilled water insulation
  • Mechanical Power & control cable installation
  • Commissioning & Testing
  • Warranty maintenance & Service

Our Clients Include

Kmart
Coles
ALDI
Big W
Bunnings
Woolworths
Dan
Target
Main
Paynter
Mc Donalds
Cex Group
Lahey